IMPLEMENTED PROJECTS

DRYING COMPLEXES

100projects
19E14DA2-7083-4A39-9731-493EC9736BDD_1_105_c
14BDB36F-913D-461E-AAD8-066E6D4BAF69_1_105_c
12890863_1708368472709786_6870656871158904490_o
DSC04922
9B8C1ABB-DA4D-427C-BF72-29DE7A9FCC09_1_105_c
IMG_7706
IMG_6381
9B025521-6592-423F-8DEB-D5731F706470_1_105_c

IMPLEMENTED PROJECTS

1
LLC "Myshkovytsky Distillery Plant"
Ternopil region, Myshkovichi

Project: Supply of PVG(a)-3500 5.0 MW burner and boiler room components.

Fuel: Chips

Equipment: Swirl burner PVG(a)-3500 5.0 Wt

2
Katerynopil elevator, Myronivski bread product

Project: Construction of a heat generating unit for a mine grain dryer Heat generator Uniter 8

Fuel: Sunflower husks

Equipment: Uniter 8 heat generator, Uniter 8 mixing chamber, IH 150 spark arrester

3
AGKOD LLC
Vinnytsia region, Khmilnytskyi district

Project: Supply of the THT-16 MWt heat generating complex Installation of the THT-16 MW heat generating complex. Construction of a generator with a thermal capacity of 16 MWt for a mine grain dryers Stela MDB-XN3/16- SB "Agkod" LLC.

Fuel: Sunflower husk pellet, agricultural waste 3 kat, wood pellet

Equipment: TGT-16MWt (PVG 3500x2000-16), with Uniter 15 mixing chamber and spark arrestor IG

WE ARE TRUSTED BY

vitmark 1
kernel 1
astarta 1
vioil 1
teslagroup 1
syngenta 1
мхп 2
grain_alliance 1
potoki 1
genbio 1